New solar panel production plant planned for Saudi Arabia

Al-Afandi Group officials signed a contract to buy land for a solar panel production facility in Saudi Arabia.
Al-Afandi Group officials signed a contract to buy land for a solar panel production facility in Saudi Arabia. -
0Comments

The Al-Afandi Group recently signed a property contract for land in Saudi Arabia, bringing its plan to build a fully integrated plant for producing solar panels one step closer to becoming a reality.

The Al-Afandi Group, which plans to build the factory on a 13.6-acre in Yanbu, Saudi Arabia, signed the property contract with the Yanbu Royal Commission.

The contract was reviewed, approved and signed by Royal Commission CEO A’laa bin Abdullah Naseef and Al-Afandi Group Chairman Shiekh Ibrahim Al-Afandi.

The contract covers the first phase of the project, which will be done in several phases. When phase one is completed, the plant will have the annual capability to produce enough solar panels to generate 120-megawatts of solar electricity (around 450,000 panels).

The Al-Afandi Group has been exporting solar PV panels to European customers since 1994, Al-Afandi Group Board Member and Commercial Director Majed Aldahawi said. He said the new agreement with the Royal Commission is in keeping with the group’s commitment for Saudi Arabia’s National Transformation Program and that the new plant will boost Saudi Arabia’s economy as well as protect it environment.

Yanbu was chosen as the site for the new plant after Al-Afandi Group officials concluded a study that began in 2012. Group officials cited the ease of working with Yanbu officials and community support for the project as some of the reasons Yanbu was selected.

Al-Afandi Group Business Development Director Al-Rasheed Alkibsy said Saudi Arabia has the world’s highest solar radiation levels, making the development of new solar-based industries a natural move. The new plant will also decrease the nation’s need for oil-fueled energy, which will lead to more oil-related export activity, he said.

The plant’s fully automated production lines will produce the panels from start to finish – from the initial smelting of crude polysilicon to produce polycrystalline silicon ingots to the framing and sealing of finished panels.



Related

HE Khalid Al Rumaihi Chairman Aluminium Bahrain (Alba)

Alba to acquire Aluminium Dunkerque for USD 2.2 billion in major industrial deal

Aluminium Bahrain (Alba) has agreed to acquire France’s largest aluminium smelter for USD 2.2 billion following an MoU signed with Bpifrance during the Choose France Summit. The deal includes significant investment by Bpifrance as minority shareholder.

Dena Almansoori

ADNOC deploys heavy-duty robot for inspections at Taweelah Gas Compression Plant

ADNOC has introduced a heavy-duty inspection robot at its Taweelah plant aimed at boosting safety during hazardous tasks. The company plans further advancements with a new operator robot capable of handling complex operations remotely or autonomously.

Hana Al Rostamani Chief Executive Officer First Abu Dhabi Bank (FAB)

First Abu Dhabi Bank reports AED 381 billion mobilised for sustainable and transition finance

First Abu Dhabi Bank says it has mobilised AED 381 billion for sustainable finance from 2022–25. The bank’s new report details support for renewable energy projects and electric vehicle adoption as part of national climate goals.

Trending

The Weekly Newsletter

Sign-up for the Weekly Newsletter from Gulf News Journal.